锦衣卫
8月28日起,济南地铁1、3、8号线末班车延时运营_我的网站

一 | Ranveer Singh’s new action film Dhurandhar released in cinemas today, December 5, and it has already created huge excitement among fans. Soon after the film ended, viewers were stunned by a post-credit scene that officially announced that the story will continue in Dhurandhar 2. The surprise reveal confirmed that a sequel is not only happening but will arrive very soon.
The makers have locked the release date for the sequel, and Dhurandhar 2 will hit theatres on March 19, 2026, which is less than three months from now. This quick turnaround suggests that director Aditya Dhar and his team filmed both parts together. The first film is over three hours and 30 minutes long, and now fans are curious about how long the second part will be.
The film stars Ranveer Singh, Sanjay Dutt, Akshaye Khanna, Arjun Rampal, R Madhavan, and Sara Arjun in key roles. Actor Rakesh Bedi, who also features in the film, had already hinted that a sequel was ready. In an earlier interview, he said, “The second instalment is around the corner, it is ready and will be released in a month or two.” He also shared that his character is inspired by a real Pakistani politician and that his full role will be revealed in Part Two.
Meanwhile, the early response to Dhurandhar has been strong. Viewers are praising the high-octane action, intense drama and Ranveer’s powerful performance. Many reviews describe the film as a massive action thriller filled with emotion, raw tension and large-scale visuals. The positive reaction has increased excitement for the upcoming sequel, which is expected to pick up right where the first film ends.
With Dhurandhar 2 already dated for 2026, the franchise appears ready to grow into one of the biggest action series in Indian cinema. Fans are eagerly waiting to see how the story unfolds next.Also Read: Deepika Padukone and Ranveer Singh’s exchange over Ranveer’s Madame Tussauds statues wins hearts。
为更好满足市民乘客夜间出行需求
自2026年8月28日起
济南地铁1、3、8号线部分方向末班车
发车时间将延后
具体优化调整如下 常态化延时
3号线
每日往滩头方向(由龙洞站发出、终点站为滩头站)的列车末班车发车时刻由22:06延后至22:39,延时时段行车间隔最小8分钟。 每周五至周日延时
1号线
往工研院方向末班车发车时刻由22:00延后至22:30,延时时段行车间隔15分钟。 8号线
往清源大街方向末班车发车时刻由22:05延后至22:30,延时时段行车间隔约12分钟。 温馨提示
01
如遇法定节假日等情况,运营信息将另行通知,您可通过“济南轨道交通”“济南地铁”微信公众号、微博、App等官方渠道,及时获取最新运营服务信息。

二 | 02
建议搭乘末班列车的乘客提前做好出行规划,可使用“济南地铁”App查询末班车时刻及换乘信息,合理安排出行时间。(来源:济南轨道交通)。

三 |
Current article:http://v4u0mg.nenyaogecebenliexi.shop/ymv9sg/20260826/4400118.html
Published on:03:19:54








